Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
01-Phase 3 | ||||
1 | BC834E04601 | 12" CONDUIT RENEWAL USING C.I.P.P. LINER, AS PER PLAN | FT | 8,229 |
2 | BC834E06101 | 15" CONDUIT RENEWAL USING C.I.P.P. LINER, AS PER PLAN | FT | 3,954 |
3 | BC834E07601 | 18" CONDUIT RENEWAL USING C,I.P.P. LINER, AS PER PLAN | FT | 964 |
4 | BC834E10601 | 24" CONDUIT RENEWAL USING C.I.P.P. LINER, AS PER PLAN | FT | 2,484 |
5 | BC834E13601 | 30" CONDUIT RENEWAL USING C.I.P.P. LINER, AS PER PLAN | FT | 3,065 |
6 | BC834E16601 | 36" CONDUIT RENEWAL USING C.I.P.P. LINER, AS PER PLAN | FT | 2,152 |
7 | BC834E57001 | 34" x 50" CONDUIT RENEWAL USING C.I.P.P. LINER, APP | LF | 68 |
8 | BC834E57002 | 38" X 57" CONDUIT RENEWAL USING C.I.P.P. LINER, APP | LF | 35 |
9 | BC611E97412 | CONDUIT, MISC: CLEAN AND VIDEO 12" CONDUIT | FT | 8,229 |
10 | BC611E97415 | CONDUIT, MISC: CLEAN AND VIDEO 15" CONDUIT | FT | 3,954 |
11 | BC611E97418 | CONDUIT, MISC: CLEAN AND VIDEO 18" CONDUIT | FT | 964 |
12 | BC611E97424 | CONDUIT, MISC: CLEAN AND VIDEO 24" CONDUIT | FT | 2,484 |
13 | BC611E97430 | CONDUIT, MISC: CLEAN AND VIDEO 30" CONDUIT | FT | 3,065 |
14 | BC611E97436 | CONDUIT, MISC: CLEAN AND VIDEO 36" CONDUIT | FT | 2,152 |
15 | BC611E97445 | CONDUIT MISC: CLEAN AND VIDEO 34" X 50" CONDUIT | LF | 68 |
16 | BC611E97446 | CONDUIT MISC: CLEAN AND VIDEO 38" X 57" CONDUIT | LF | 35 |
27 | 802E00013 | SPECIAL: POINT REPAIR, APP 40 West Cresentville |
LS | 1 |
BC811E98635A | CATCH BASIN NO 3 RECONSTRUCTED TO GRADE, AS PER PLAN Contingency item to be used at the direction of the engineer, remove and replace portions of catch basin as needed for installation of C.I.P.P. |
EA | 0 | |
BC811E98635F | CATCH BASIN 2-4 RECONSTRUCTED TO GRADE, AS PER PLAN Contingency item to be used at the direction of the engineer, remove and replace portions of catch basin as needed for installation of C.I.P.P. |
EA | 0 | |
BC811E98635G | CATCH BASIN NO. 2-5 RECONSTRUCTED TO GRADE, AS PER PLAN Contingency item to be used at the direction of the engineer, remove and replace portions of catch basin as needed for installation of C.I.P.P. |
EA | 0 | |
BC811E98635H | CATCH BASIN 2-2 RECONSTRUCTED TO GRADE, APP Contingency item to be used at the direction of the engineer, remove and replace portions of catch basin as needed for installation of C.I.P.P. |
EA | 0 | |
BC811E99661B | MANHOLE NO 3 RECONSTRUCTED TO GRADE, AS PER PLAN Contingency item to be used at the direction of the engineer, remove and replace portions of manhole as needed for installation of C.I.P.P. |
EA | 0 | |
02-Incidentals | ||||
22 | 624E10000 | MOBILIZATION | LS | 1 |
23 | 614E11000 | MAINTAINING TRAFFIC | LS | 1 |
24 | 802E00001 | PREMIUM ON INDUSTRIAL INSURANCE | LS | 1 |
25 | 802E00002 | PREMIUM ON BID BOND | LS | 1 |
26 | 802E00003 | CONTINGENCIES The Contractor shall enter $1.00 in the unit price column and $382,800.00 in the total column. If the Contractor neglects to enter the correct figure(s), the Contractor's bid will be corrected and the process for ""Mistake in Bid"" shall follow. This item will be used in the event that there are change orders in the Contract. No work will be paid or recognized under this item unless agreed upon in writing by an authorized representative of the Butler County Engineer's Office." |
EA | 382,800 |