Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
1-ROADWAY | ||||
5 | 201E99000 | SPECIAL - CLEARING AND GRUBBING | LUMP | 1 |
6 | 202E99000 | SPECIAL - STRUCTURE REMOVED | LUMP | 1 |
7 | 202E99020 | SPECIAL - PAVEMENT REMOVED | LUMP | 1 |
8 | 203E99000 | SPECIAL - EARTHWORK | LUMP | 1 |
9 | 304E99000 | SPECIAL - AGGREGATE BASE | LUMP | 1 |
10 | 448E99000 | SPECIAL - FLEXIBLE PAVEMENT | LUMP | 1 |
11 | 512E99000 | SPECIAL - SEALING OF CONCRETE | LUMP | 1 |
12 | 512E72500 | SPECIAL - TEST PATCH | LUMP | 1 |
13 | 517E99000 | SPECIAL, RAILING | LUMP | 1 |
14 | 526E99000 | SPECIAL - REINFORCED CONCRETE APPROACH SLABS, AS PER CONCEPTUAL DOCUMENTS | LUMP | 1 |
15 | 530E99000 | SPECIAL - STRUCTURE FOUNDATION | LUMP | 1 |
16 | 530E99010 | SPECIAL - SUBSTRUCTURE | LUMP | 1 |
17 | 530E99020 | SPECIAL - SUPERSTRUCTURE | LUMP | 1 |
20 | 606E99000 | SPECIAL - GUARDRAIL | LUMP | 1 |
22 | 606E99100 | SPECIAL - IMPACT ATTENUATOR | LUMP | 1 |
23 | 614E99000 | SPECIAL - MAINTAINING TRAFFIC | LUMP | 1 |
24 | 616E99000 | SPECIAL - DUST CONTROL | LUMP | 1 |
25 | 619E99000 | SPECIAL - FIELD OFFICE | LUMP | 1 |
26 | 623E99000 | SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING | LUMP | 1 |
27 | 624E99000 | SPECIAL - MOBILIZATION | LUMP | 1 |
28 | 626E99000 | SPECIAL - BARRIER REFLECTORS | LUMP | 1 |
29 | 630E99000 | SPECIAL - SIGNS AND SUPPORTS | LUMP | 1 |
30 | 630E99100 | SPECIAL, REMOVAL OF SIGNS AND SUPPORTS | LUMP | 1 |
31 | 646E99000 | SPECIAL - PAVEMENT MARKING | LUMP | 1 |
32 | 659E99000 | SPECIAL - PERMANENT EROSION CONTROL | LUMP | 1 |
34 | 690E20020 | SPECIAL - FIELD SURVEYS | LUMP | 1 |
38 | 690E20080 | SPECIAL - SUBSURFACE INVESTIGATIONS | LUMP | 1 |
42 | 690E20240 | SPECIAL - ROADWAY | LUMP | 1 |
46 | 202E99100 | SPECIAL - REMOVAL This item is for the removal and disposal and or delivery of the existing temporary traffic signals as per the Proposal Note. |
LS | 1 |
51 | 530E99040 | SPECIAL - STRUCTURES | LS | 1 |
52 | 611E97800 | SPECIAL - DRAINAGE | LS | 1 |
2-EROSION CONTROL | ||||
47 | 832E15000 | STORM WATER POLLUTION PREVENTION PLAN This item includes all costs associated with the development, implementation, inspection and the required documentation of a Storm Water Pollution Prevention Plan for the Project described in this Contract. all of the specifications and requirements of ODOT supplemental specification 832 shall apply. |
LS | 1 |
48 | 832E15002 | STORM WATER POLLUTION PREVENTION INSPECTIONS | LS | 1 |
49 | 832E15010 | STORM WATER POLLUTION PREVENTION INSPECTION SOFTWARE | LS | 1 |
50 | 832E30000 | EROSION CONTROL This item is for the installation of Storm Water BMPS as defined in appendix "F" of ODOT supplemental specifications 832. The Contractor shall enter $1.00 in the unit price column and $35,000.00 in the total column. If the Contractor neglects to enter the correct figure(s) the Contractors bid will be corrected and the process for "Mistake In Bid" shall follow. No work will be recognized or paid under this item unless agreed upon and approved by an authorized representative of the Butler County Engineer's Office. |
EACH | 35,000 |
3-WATER WORK | ||||
45 | 638E99000 | SPECIAL - WATER WORKS | LS | 1 |
4-MISC | ||||
1 | 100E99010 | SPECIAL - PROFESSIONAL LIABILITY INSURANCE | LUMP | 1 |
2 | 103E99010 | SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | LUMP | 1 |
3 | 107E99000 | SPECIAL - UTILITY COORDINATION | LUMP | 1 |
4 | 108E99100 | SPECIAL - CPM PROGRESS SCHEDULE FOR SHORT DURATION PROJECTS | LUMP | 1 |
33 | 690E20010 | SPECIAL - AS-BUILT CONSTRUCTION PLANS | LUMP | 1 |
35 | 690E20040 | SPECIAL - PRELIMINARY DESIGN | LUMP | 1 |
36 | 690E20050 | SPECIAL - FINAL DESIGN | LUMP | 1 |
37 | 690E20060 | SPECIAL - FINAL PLAN SUBMISSION | LUMP | 1 |
39 | 690E20200 | SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD | LUMP | 1 |
40 | 690E20210 | SPECIAL - FINAL PLANS FOR DESIGN-BUILD | LUMP | 1 |
41 | 690E20220 | SPECIAL - CONSTRUCTION PLANS | LUMP | 1 |
44 | 802E00003 | CONTINGENCIES The Contractor shall enter $1.00 in the unit price column and $175,000.00 in the total column. If the Contractor neglects to enter the correct figure(s), the Contractor's bid will be corrected and the process for "Mistake in Bid" shall follow. This item will be used in the event that there are change orders in the Contract. No work will be paid or recognized under this item unless agreed upon in writing by an authorized representative of the Butler County Engineer's Office. |
EA | 175,000 |