bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 11/04/2024 1:31 PM EST | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
01-ROADWAY
1 201E11000 CLEARING AND GRUBBING LS 1
2 202E23000 PAVEMENT REMOVED SY 135
3 203E10000 EXCAVATION CY 1,298
4 203E20000 EMBANKMENT CY 150
5 253E010002 FULL DEPTH PAVEMENT RESTORATION SY 135
6 642E00090 EDGE LINE, 4"
White
MI 0.01
7 642E00290 CENTER LINE
4", Double Yellow
MI 0.01
8 642E00390 CHANNELIZING LINE, 8 FT 18
9 659E00100 SOIL ANALYSIS TEST EACH 2
10 659E00300 TOPSOIL CY 392
11 659E10001 SEEDING AND MULCHING, AS PER PLAN SY 3,527
12 659E20000 COMMERCIAL FERTILIZER TON 0.47
13 659E31000 LIME ACRE 0.73
14 659E35000 WATER MGAL 19
15 659E40000 MOWING MSF 31.7
16 691E00500 SPECIAL - HERBICIDE FOR WEED CONTROL
As directed by the Engineer
SY 3,527
02-EROSION CONTROL
17 601E45040 INFILTRATION TRENCH FILTER
As Per Plan
CY 57
18 832E15000 STORM WATER POLLUTION PREVENTION PLAN
This item includes all costs associated with the development, implementation, inspection and the required documentation of a Storm Water Pollution Prevention Plan for the Project described in this Contract. all of the specifications and requirements of ODOT supplemental specification 832 shall apply.
LS 1
19 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS LS 1
20 832E30000 EROSION CONTROL
This item is for the installation of Storm Water BMPS as defined in appendix "F" of ODOT supplemental specifications 832. The Contractor shall enter $1.00 in the unit price column and $4,075.00 in the total column. If the Contractor neglects to enter the correct figure(s) the Contractors bid will be corrected and the process for "Mistake In Bid" shall follow. No work will be recognized or paid under this item unless agreed upon and approved by an authorized representative of the Butler County Engineer's Office.
EACH 4,075
03-DRAINAGE
21 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN CY 14.8
22 511E46611 CLASS QC1 CONCRETE, HEADWALL, AS PER PLAN
Includes Wingwall
CY 7.6
23 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) SY 71
24 512E33000 TYPE 2 WATERPROOFING SY 131
25 512E33010 TYPE 3 WATERPROOFING SY 134
26 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLAN
Includes both structures
LS 1
27 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER CY 56
28 BC811E01500 6" CONDUIT, TYPE F
Contingency
FT 150
29 BC811E94800 8' X 4' BOX CULVERT, TYPE A
As Per Plan
FT 106
04-MISCELLANEOUS
30 607E30000 FENCE, SNOW FT 910
31 614E11001 MAINTAINING TRAFFIC, AS PER PLAN LS 1
32 616E10000 WATER
Contingency
MGAL 50
33 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING LS 1
34 624E10000 MOBILIZATION LS 1
35 802E00001 PREMIUM ON INDUSTRIAL INSURANCE LS 1
36 802E00002 PREMIUM ON BID BOND LS 1
37 802E00003 CONTINGENCIES
The Contractor shall enter $1.00 in the unit price column and $35,000.00 in the total column. If the Contractor neglects to enter the correct figure(s), the Contractor's bid will be corrected and the process for "Mistake in Bid" shall follow. This item will be used in the event that there are change orders in the Contract. No work will be paid or recognized under this item unless agreed upon in writing by an authorized representative of the Butler County Engineer's Office.
EA 35,000